Closed
US 191 Turnouts – Gallatin Canyon 09/11/2024
Sixmile Cr Wildlife Xing Study (OT) 09/11/2024
I-90 Wildlife Crossing Study 09/10/2024
West Three Forks Interchange Improvement 08/06/2024
Statewide Bridge Deck Rehab 08/06/2024
2024-2027 Bridge Design Term Contracts 07/10/2024
Geotechnical Manual 04/17/2024
Traffic Engineering and Operations Manual 03/15/2024
2024 State Aviation System Plan Update 02/14/2024
2024-2026 Bridge Non-Destructive Testing Term Contracts 01/10/2024
2024-2026 Environmental Engineering Term Contracts 01/10/2024
2023-2027 Engineering Services and Lincoln Airport 07/11/2023
2023 Prequalification Roster (Update to the 2022 Rosters) 05/03/2023
2023-2026 General Engineering Term Contract 04/12/2023
2023-2026 Alternative Contracting-General Engineering Consultant Term Contract 04/18/2023
2023-2026 Remote Sensing Term Contract 02/15/2023
US-191/MT-64 Feasibility Study 12/12/2022
2023-2025 Traffic Safety Term Contract 11/15/2022
2023-2026 Traffic Operations Term Contract 11/09/2022
Statewide Retaining Wall Study 08/11/2022
SF 169 S of Pablo Sfty Imprv 08/03/2022
2022-2025 Bridge Overweight Vehicle Load Rating and Permitting 06/23/2022
2022-PreQualification Roster 05/23/2022
Hydraulic Design Term Contracts 04/25/2022
Off System Bridge Study 03/23/2022
Kalispell-Whitefish Access 02/18/2022
2022-2024 Survey Term Contracts - REVISED 02/02/2022 02/15/2022
2022-2024 Bridge Underwater Inspection Term Contracts 12/13/2021
2022-2024 Environmental Natural Resources - Design Term Contracts 12/13/2021
2022-2024 Environmental Natural Resources - Construction Term Contracts 12/13/2021
2022-2024 Bridge NBI Climbing Inspection Term Contracts 11/15/2021
2022-2024 Geotechnical Term Contract 10/18/2021
2022-2024 Bridge Inspection Term Contract 10/18/2021
2022-2024 Construction Engineering & Inspection (CEI) Term Contracts 10/18/2021
2021 Prequalification Roster 06/01/2021
2021 Aviation System Plan Update - PCI 2/16/2021
Belgrade – Urban Improvements 2/16/2021
2021-2023 Environmental Engineering Term Contract 11/12/2020
MT-200 Bridge – Lewistown Area - REVISED 10/5/2020 10/19/2020
2021-2024 Bridge Load Rating Term Contract 10/15/2020
2021-2023 Steel Fabrication Inspection and Testing Term Contract 10/13/2020
Bridge Deck S – 234 Havre 09/28/2020
SF 109 - GR NE Bozeman (PH2) 09/28/2020
Gold Creek Truck Parking Area 09/28/2020
SF 169 – W King Ave Lighting 09/28/2020
Bridge Inspection Program Quality Assurance 2021-2022 09/23/2020
Timber Bridges – Glasgow Area 08/24/2020
2020 Tunnel Inspection 07/27/2020
2021-2025 Planning Services at Yellowstone Airport 08/11/2020
2021-2025 Engineering Services at Yellowstone Airport 08/11/2020
2021-2025 Planning Services at Lincoln Airport 08/11/2020
I-90 Bear Gulch Rd Interchange Study 07/23/2020
Quartz Flats Rest Area
   Memo
   Concept Layout
07/16/2020
MT-80 Slide Repair – Arrow Creek 07/21/2020
2020 Prequalification Roster 05/26/2020
2020-2022 Value Analysis Team Leader Term Contract 03/23/2020
2020-2022 Petrographic Analysis Term Contract 02/25/2020
2020-2022 Bridge-NDT Term Contract 11/18/2019
2020-2022 Subsurface Utility Engineering Term Contracts 11/18/2019
2020-2022 Hydraulic Design Term Contracts 09/03/2019
Hot Springs N S and (tied projects) Trout Creek – SE
    Current Questions and Answers
09/10/2019
Bridge Decks Hwy 64 Big Sky
    Current Questions and Answers
09/10/2019
Brady – N S (NB)
    Current Questions and Answers
09/10/2019
Corral Cr – 11 M NE Circle
    Current Questions and Answers
09/10/2019
Peritsa Cr – 6 M W of Hardin
    Current Questions and Answers
09/10/2019
2019 Prequalification Roster 05/31/2019
Bridge Scour Study 05/23/2019
Chinook East 05/22/2019
Madison River Corridor Study 03/13/2019
Whitefish Urban Study 02/14/2019
2019-2021 Hamburg Testing Term Contracts 01/25/2019
2019-2021 NBIS Bridge Inspection Term Contracts 01/24/2019
2019-2021 District Survey Term Contracts 12/27/2018
Lockwood Interchange - Billings 12/27/2018
2019-2020 Environmental Engineering Term Contracts 11/26/2018
2019-2023 Engineering Services at Lincoln Airport 11/21/2018
Bad Rock Canyon Study 11/19/2018
2019-2021 Geotechnical Engineering Term Contract 11/16/2018
2019-2021 MDT Department Manuals Term Contract 11/15/2018
2019-2021 Remote Sensing Term Contract 10/25/2018
2019-2021 Bridge Climbing Inspection Term Contract 10/24/2018
KBP – US 93 to Airport Road 10/23/2018
2019-2021 Environmental Natural Resources - Design Term Contracts 10/23/2018
2019-2021 Environmental Natural Resources - Construction Term Contracts 10/23/2018
SF 179 I-90 Jens Safety Improvement 06/29/2018
Bridge Underwater Inspection Term Contracts 06/27/2018
2018 Prequalification Roster 05/31/2018
Intent to Sole Source: Materials Deck Forensic Analysis 05/03/2018
Clark Fork - 1M NW Trout Creek 04/18/2018
2018 State Aviation System Plan Update 04/12/2018
Agricultural Loads on MT Bridges 12/19/2017
2018-2021 Load Rating Bridges Term Contract 11/28/2017
Conner - South 11/16/2017
2018-2020 Steel Fabrication Inspection and Testing Term Contract 11/14/2017
Jct. Sec. 250 - North 09/21/2017
27th Street RR Crossing - BLGS 09/11/2017
Right-of-Way Design Term Contract 09/11/2017
Mobridge Geotechnical Study 09/11/2017
Pavement Management Software – Analyze & Update 05/23/2017
Hamburg Acceptance Testing Term Contracts 05/17/2017
Consultant Pre-qualification for Highway Project Development 05/11/2017
2017-2019 VA Team Leader Term Contract 02/16/2017
RR Undercrossing Study 01/31/2017
2017-2019 Hydraulic Design Term Contract 09/29/2016
West of Missoula - NW 06/16/2016
2016-2018 Unmanned Aerial System (UAS) Term Contract 05/24/2016
2016 Consultant Pre-qualification for Highway Project Development 05/12/2016
2016-2018 Bridge Non-Destructive Testing Term Contracts 04/18/2016
2016-2018 NBIS Bridge Inspections Term Contract 04/11/2016
2016-2018 Bridge NBI Inspection Term Contracts 04/05/2016
Statewide MDT Stream Mitigation Annual Monitoring Term Contract 02/16/2016
Statewide Wetland Mitigation Monitoring Term Contract 01/15/2016
Statewide Traffic Signal System Evaluation and Development Project 01/11/2016
2016-2018 Natural Resources - Construction Term Contract 12/16/2015
2016-2018 Remote Sensing Term Contract - Revised 11/19/2015 12/15/2015
Lincoln Rd - Montana to I-15 11/19/2015
SUE Term Contract 11/18/2015
2016-2018 Remediation and Assessment Term Contracts 11/17/2015
Swan River-Bridge St (Big Fork)
Swan River - Bridge St (Big Fork) Supplemental
10/07/2015
2015-2020 Engineering Services at Yellowstone Airport Term Contract 09/15/2015
Tranplan 21 Update 06/30/2015
2015 Aviation System Plan – PCI’s 05/20/2015
2015 Consultant Pre-Qualification for Highway Project Development04/30/2015
2015-2016 Value Analysis Team Leader Term Contract 02/11/2015
2014-2015 Underwater Bridge Inspection Term Contract 10/09/2014
Billings Bypass: Attachment 1 09/11/2014
I-90 Yellowstone R – Billings06/19/2014
2014 Consultant Pre-Qualification for Highway Project Development 04/29/2014