logo

Upcoming opportunities to learn more and provide feedback:

Join us on-line for a live presentation and Q&A
March 14, 2023, from Noon to 1 p.m.
Please click the link below to join the webinar:
https://mt-gov.zoom.us/j/82858651666?pwd=am4rMlk4STI4bmsxcENnY0lJcU1pZz09 [mt-gov.zoom.us]
Passcode: 017708

Or One tap mobile:
US: +12063379723,,82858651666#,,,,*017708# or +12133388477,,82858651666#,,,,*017708#
Or Telephone:
Dial (for higher quality, dial a number based on your current location):
US: +1 206 337 9723 or +1 213 338 8477 or +1 646 558 8656
Webinar ID: 828 5865 1666
Passcode: 017708
International numbers available: https://mt-gov.zoom.us/u/kd10jTw5bx [mt-gov.zoom.us]

Or an H.323/SIP room system:
H.323: 162.255.37.11 [162.255.37.11] (US West) or 162.255.36.11 [162.255.36.11] (US East)
Meeting ID: 828 5865 1666
Passcode: 017708
SIP: 82858651666@zoomcrc.com
Passcode: 017708

Join us for an In-person Project Open House
March 22, 2023, from 3:30 p.m. to 6 p.m.
Hampton Inn (725 Carter Drive, Helena)

You can also submit comments using the MDT Comment Form.

Project Overview

The Montana Department of Transportation (MDT) is designing intersection improvements along US 12 in southeast Helena at:

  • Tricia Street/Centennial Drive (Frontage Roads).
  • Shephard Way.
  • Elaine Street.
  • Lola Street.
  • Nicole Street.

The need for the project is due to the high frequency of crashes resulting from vehicles turning left from the Lola Street onto the westbound lanes of US 12. The goals of the project are to:

  • Enhance safety for all users.
  • Reduce congestion.
  • Minimize impacts to adjacent properties.

After careful consideration of safety and operational needs, and input from the public and area stakeholders in March 2019 and September 2020, the project team has identified the following improvements were determined to best meet the safety and operational needs:

  • A new traffic signal on US12 at Nicole Street/North Street.
  • A roundabout at the North Street-Tricia Street/Lola Street intersection.
  • Removing access to US 12 at, Elaine Street, Lola Street, and between Colleen and Florence Streets.
  • Re-direct vehicle traffic from Shepard Way to access US 12 only from the west, as North Street to the east will be disconnected.
  • Improved pedestrian/cyclist crossing at the signalized intersection of Nicole Street/US 12 to access the existing shared use path on the north side of US 12, between the highway and Centennial Drive.

Design will continue through fall of 2023. Construction is tentatively scheduled for 2025.

UPN 9026000