June 24-30, 2024

  • The Montana Department of Transportation (MDT) and its partner Knife River will continue pipework this week, removing curbing and sidewalks along Merrill Avenue and prepping for gutter and sidewalk pours.
  • Crews are working Monday through Saturday from 7 a.m. to 7 p.m., weather and other factors permitting.
  • The posted speed limit is 25 mph. No passing. Help keep construction workers and other drivers safe by following all posted signage.
  • Fourth of July Holiday: Crews will pause construction activities at 3 p.m. on Wednesday, July 3, and resume on Monday, July 8.

June 17-23, 2024: UPDATED 6/20/24

  • The Montana Department of Transportation (MDT) and its partner Knife River will continue pipework this week, removing curbing and sidewalks along Merrill Avenue and prepping for gutter and sidewalk pours.
  • Celebrate Glendive festivities have been moved back to Friday, June 21 (weather permitting). If weather interferes, events will be moved to Saturday, June 22. Please contact local event and news sources for up-to-date event information. Construction will not occur along streets where the event is being hosted.
  • Crews are working Monday through Saturday from 7 a.m. to 7 p.m., weather and other factors permitting.
  • NOTE: The posted speed limit is 25 mph. No passing. Help keep construction workers and other drivers safe by following all posted signage.

Width Restrictions

  • There are no width restrictions currently in place for this project.

511MT:

  • Current Montana construction information, width restrictions, and road conditions can be found at www.511mt.net.

June 10-17, 2024

  • The Montana Department of Transportation (MDT) and its partner Knife River are working Monday through Saturday from 7 a.m. to 7 p.m., weather and other factors permitting.
  • Crews will continue removing curbing and sidewalks along Merrill Avenue and prepping for gutter and sidewalk pours.
  • Barry Underpass is currently closed to through traffic on both sides, but pedestrian access will be restored this week.
  • NOTE: The posted speed limit is 25 mph. No passing. Help keep construction workers and other drivers safe by following all posted signage.

Width Restrictions

  • There are no width restrictions currently in place for this project.

511MT:

  • Current Montana construction information, width restrictions, and road conditions can be found at www.511mt.net.

June 3-9, 2024

Construction Update
The Montana Department of Transportation (MDT) and its partner Knife River are working Monday through Saturday from 7 a.m. to 7 p.m., weather and other factors permitting.

Crews are removing curbing and sidewalks along Merrill Avenue; curb, gutter, and sidewalk concrete pouring to follow.

NOTE: The posted speed limit is 25 mph. No passing. Help keep construction workers and other drivers safe by following all posted signage.

Width Restrictions

  • There are no width restrictions currently in place for this project.