Please be aware some files will download as zip files and download time is dependent on your network speed.
Please look for files in your download directory.
First visit? Take a few minutes to read our Disclaimer.
Please be aware some files will download as zip files and download time is dependent on your network speed.
Please look for files in your download directory.
First visit? Take a few minutes to read our Disclaimer.
There are no current announcements.
Approved Construction Equipment List (ACEL)
Bridge Standard Drawings
Buy America - Title 23 CFR 635.410
Build America, Buy America – IIJA (Public Law No. 117-58)
Construction Memos
Construction Reports
Contractor Submittals
Detailed Drawings
Environmental
Erosion Control Rates
Forms & Permits
Frequently Asked Questions
Fuel Prices
Manuals
Materials List
Materials Manual
Montana Partnering Field Guide
Partnering Program
PIF / Certifications
Prequalified Contractors
Prevailing Wage/OJT Compliance
Qualified Products
Special Provisions
Standard Specifications
Steel Prices
Suspended Bidders (Federal)
Suspended Bidders (State)
Traffic Control Rate Schedule
Transportation Commission Policies
WAQTC Training and Qualified Technicians
Work Zone Safety and Mobility
2014 English Item List
2020 English Item List
Alternative Contracting Webpage | As Read Final Selection | Awarded CM/GC Packages
The ability to access this information online is not to be construed as an indication that a person or entity is eligible to receive bid proposals or to bid on projects for which bids are being solicited. Official bid proposal documents issued by the Department of Transportation must be used when bidding.
The availability of online information does not relieve prospective bidders of their obligation to review and become familiar with the plans, specifications, addenda, bidding requirements, site conditions, and all other relevant project and bidding requirements.
It is the contractor's responsibility to view any clarifications and/or questions and answers that are posted on the Question & Answer Forum for any project they may be submitting a bid on as a prime bidder, a subcontractor or a supplier. The information supplied in the forum is subject to change up until 5:00 PM on the day before the scheduled bid letting. The information that is posted at that time will be included in the awarded contract. Always refresh/reload your view when revisiting the forum to be sure you are accessing the most current information.